-
Debonded prestressed strand in prestressed beams
(12/2017)
Status: Completed
-
ADA Workshops for Local Agencies, FY18
(11/2017)
Status: Completed
-
Multimodal Connections with Transitways: Ridership, Access Mode, and Route Choice Implications - Phase II Analysis and Documentation
(11/2017)
Status: Completed
-
Performance Benefits of Fiber-reinforced Thin Concrete Pavement and Overlays
(11/2017)
Status: Completed
-
Anchorage of epoxy-coated rebar using chemical adhesives
(11/2017)
Status: Completed
-
Snow Control Web Tools Maintenance and Administration, FY18
(11/2017)
Status: Completed
-
Bridge Deck Performance
(11/2017)
Status: Completed
-
Workshop for Defining and Advancing Minnesota's Autonomous Vehicles Agenda
(11/2017)
Status: Completed
-
Identify Potential Causes of Truck Bottlenecks on Freeways and Develop Mitigation Strategies
(10/2017)
Status: Completed
-
A data-driven strategic planning tool for purchasing and maintenance of mobile equipment
(10/2017)
Status: Completed
-
Towards Zero Deaths Admin/Outreach, 2017-18 (FFY2018)
(10/2017)
Status: Completed
-
Minnesota Council on Transportation Access Outreach Support, FY18
(10/2017)
Status: Completed
-
Evaluation of Central Traffic Signal System and Best Practices for Implementation: Phase 1
(10/2017)
Status: Completed
-
Characterization of Runoff Quality from Paved Low Volume Roads and Optimization of Treatment Methods
(10/2017)
Status: Completed
-
How Locals Need To Prepare for the Future of V2V/V2I Connected Vehicles
(10/2017)
Status: Completed
-
Peer-to-Peer Sharing Economy with Application to Shared Mobility
(09/2017)
Status: Completed
-
Evaluation of the Effectiveness of Stop Lines in Increasing the Safety of Stop-Controlled Intersections
(09/2017)
Status: Completed
-
Towards Zero Deaths Conference, 2017-2018
(09/2017)
Status: Completed
-
Towards Zero Death Regional Workshops Support, FY18-19
(09/2017)
Status: Completed
-
Advanced Flexibility in Design and Complete Streets Workshops, FY 18
(08/2017)
Status: Completed
-
Development and Regionalization of In Situ Bioslopes and Bioswales
(08/2017)
Status: Completed
-
Governance of Bicycle Sharing
(08/2017)
Status: Completed
-
Administrative Support for the Minnesota Freight Advisory Committee - FY18
(08/2017)
Status: Completed
-
Accessibility Impact Analysis of I-94 MnPASS Lanes by Auto and Transit
(08/2017)
Status: Completed
-
Assessing How Local-Level Law Enforcement Strategies Influence Binge Drinking and Alcohol-Impaired Driving in Communities Across the U.S.
(08/2017)
Status: Completed
-
Project Management Training, Fall 2017-Spring 2018
(08/2017)
Status: Completed
-
Professional Technical Contracts Training
(08/2017)
Status: Completed
-
Investigating inductive loop signature technology for statewide vehicle classification counts
(08/2017)
Status: Completed
-
Cost/Benefit Analysis of the Effectiveness of Crack Sealing Techniques
(07/2017)
Status: Completed
-
I-94 Connected Vehicles Testbed Operations and Maintenance
(07/2017)
Status: Completed
-
Transportation Policy and Economic Competitiveness, Year 5
(07/2017)
Status: Completed
-
Optimizing the Nutrition of Roadside Plants for Pollinators
(07/2017)
Status: Completed
-
Investigating Wastewater Reuse at Safety Rest Areas and Truck Stations
(06/2017)
Status: Completed
-
Adaptive Management to Improve Deicing Operations
(06/2017)
Status: Completed
-
Experimental and Computational Investigations of High Density Asphalt Mixtures
(06/2017)
Status: Completed
-
Evaluation of Sustained Enforcement, Education, and Engineering Measures on Pedestrian Crossings
(06/2017)
Status: Completed
-
Analysis of Interstate 405 Traffic Data and Performance Measures, And Recommendations to Improve Corridor Performance
(06/2017)
Status: Completed
-
Examining Optimal Sight Distances at Rural Intersections
(06/2017)
Status: Completed
-
Monitoring and habitat assessment of declining bumble bees in Twin Cities metro roadsides
(06/2017)
Status: Completed
-
Remaining Service Life Asset Measure, Phase 1
(06/2017)
Status: Completed
-
2017 National Summer Transportation Institute
(06/2017)
Status: Completed
-
Research and Library Report Publication Services, 2018-2019
(06/2017)
Status: Completed
-
MnDOT Project Manager Workshops, FY18
(05/2017)
Status: Completed
-
Minnesota User Based Fee Demonstration Plan
(05/2017)
Status: Completed
-
Understanding and mitigating the dynamic behavior of RICWS and DMS under wind loading
(05/2017)
Status: Completed
-
After Study of the Bus Rapid Transit 'A Line' Impacts
(05/2017)
Status: Completed
-
Measuring Travel Happiness in Shenzhen: Framework and Application.
(04/2017)
Status: Completed
-
Work Zone Mapping and Tag Deployment System
(04/2017)
Status: Completed
-
Experimental Shear Capacity Comparison Between Repaired and Unrepaired Girder Ends
(03/2017)
Status: Completed
-
Operational Research Program for Local Transportation Groups, FY17-18
(03/2017)
Status: Completed
-
MnDOT Project Management Training, Spring 2017
(03/2017)
Status: Completed
-
Cloud connected delivery vehicles: boosting fuel economy using physics-aware spatiotemporal data analytics and real-time powertrain control
(03/2017)
Status: Completed
-
eWorkPlace Phase 3
(03/2017)
Status: Completed
-
Minnesota Crash Records Audit
(03/2017)
Status: Completed
-
Full-Day Accessibility Evaluation of Transit Systems Using GPS-Based Location Data
(03/2017)
Status: Completed
-
Examining the Relationship Between Speed Enforcement Laws and Traffic Safety
(02/2017)
Status: Completed
-
Preliminary Layout Geometric Design and Roundabout, FY17
(02/2017)
Status: Completed
-
Truck Weight Compliance Education and Outreach Program 2017-2019
(01/2017)
Status: Completed
-
New CEO Orientation and Peer Exchange Workshop, 2017
(01/2017)
Status: Completed