-
Snow Control Web Tools: Maintenance and Administration FY16
(12/2015)
Status: Completed
-
Those who Need it Most: Maximizing Transit Accessibility and Removing Barriers to Employment in Areas of Concentrated Poverty (Phase 3-Hennepin County)
(12/2015)
Status: Completed
-
MnDOT Consultant Workshop, 2016
(12/2015)
Status: Completed
-
Cost-competitive Timber Bridge Designs for Long Term Performance
(12/2015)
Status: Completed
-
Evaluation of the Smart Work Zone Speed Notification System
(11/2015)
Status: Completed
-
Develop a Tool to Determine MnPASS Access Spacing
(11/2015)
Status: Completed
-
Assessing the Impact of Pedestrian-Activated Crossing Systems
(11/2015)
Status: Completed
-
Specific Strategies for Achieving Transit-Oriented Economic Development: Applying National Lessons to the Twin Cities -- Phase 2
(11/2015)
Status: Completed
-
Development of a Road Condition Recovery Time Estimation System for Winter Snow Events
(10/2015)
Status: Completed
-
LRRB Focus Groups, 2016 - 2017
(10/2015)
Status: Completed
-
Advanced Flexibility in Design and Complete Streets, FY16
(10/2015)
Status: Completed
-
RICWS Evaluation and Design Investigation
(10/2015)
Status: Completed
-
Toward Zero Deaths (TZD) Admin/Outreach, 2015-2016
(10/2015)
Status: Completed
-
RS Report Publication Services, FY16
(10/2015)
Status: Completed
-
Towards Zero Deaths (TZD) Conference, 2015-2016
(09/2015)
Status: Completed
-
Minnesota Council on Transportation Access (MCOTA) Support - Regional Coordination Workshops/Design Assistance
(09/2015)
Status: Completed
-
CPS: TTP Option: Synergy: Collaborative Research: Dynamic Methods of Traffic Control that Impact Quality of Life in Smart Cities
(09/2015)
Status: Completed
-
Project Manager Workshops, FY16
(09/2015)
Status: Completed
-
Minnesota Council on Transportation Access (MCOTA) Outreach Support FY16
(09/2015)
Status: Completed
-
Expanding the Adoption on Private Lands: Blowing and Drifting Snow Control Treatments and the Cost Effectiveness of Permanent versus Non-Permanent Treatment Options.
(09/2015)
Status: Completed
-
Feasibility of vibration-based long-term bridge monitoring using I35W St. Anthony Falls Bridge
(09/2015)
Status: Completed
-
Administrative Support for the Minnesota Freight Advisory Committee (MFAC) - Fiscal Year 2016
(08/2015)
Status: Completed
-
Traffic Sign Retro-Reflectivity Training Workshops FY16
(08/2015)
Status: Completed
-
National Accessibility Evaluation
(07/2015)
Status: Completed
-
Transportation Policy and Economic Competitiveness, year 3
(07/2015)
Status: Completed
-
Local Technical Assistance Program (LTAP), FY16
(07/2015)
Status: Completed
-
Hydraulic Power Supply for the Mechanical Testing of Resilient and Sustainable Structures, Pavements, Geomaterials, and Medical Devices
(07/2015)
Status: Completed
-
In-Vehicle Work Zone Messages
(07/2015)
Status: Completed
-
Reducing Emissions from Open Burning through Biomass Gasification
(07/2015)
Status: Completed
-
SRN: Integrated Urban Infrastructure Solutions for Environmentally Sustainable, Healthy and Livable Cities
(07/2015)
Status: Completed
-
CPS: Breakthrough: Improving Metropolitan-Scale Transportation Systems with Data-Driven Cyber-Control
(07/2015)
Status: Completed
-
Constrained Market Pricing and Revenue Adequacy: Regulatory Implications for Rail Carriers and Shippers
(07/2015)
Status: Completed
-
Understanding Manufacturers' Perspectives on Transportation in Four MnDOT Districts: An Industry Cluster Approach
(07/2015)
Status: Completed
-
National Summer Transportation Institute (NSTI) at University of Minnesota
(06/2015)
Status: Completed
-
MnPAVE-Rigid 2.0
(06/2015)
Status: Active
-
Development of Travel Time Reliability Measurement System
(05/2015)
Status: Completed
-
A Mechanistic Design Approach for Novel Graphene Nanoplatelet (GNP) Reinforced Asphalt Pavements for Low Temperature Applications
(05/2015)
Status: Completed
-
Collaborative Consumption in Peer-to-Peer Car Sharing
(05/2015)
Status: Completed
-
Test and Demonstration of Connected Vehicles Applications to Maintenance Operations
(05/2015)
Status: Completed
-
Life-Cycle Cost Analysis Tool for Minnesota Pavements
(05/2015)
Status: Completed
-
Slope Stabilization and Repair Solutions for Local Government Engineers
(05/2015)
Status: Completed
-
Enhanced capabilities of BullReporter and BullConverter
(05/2015)
Status: Completed
-
The Transportation Futures Project: Planning for Technology Change
(04/2015)
Status: Completed
-
Exploring Walking Tolerance of Transitway Users
(04/2015)
Status: Completed
-
Expanding the Success of Salt-Tolerant Roadside Turfgrasses through Innovation and Education
(04/2015)
Status: Completed
-
Pothole Prevention and Innovative Repair
(04/2015)
Status: Completed
-
Comparing Properties of Water Absorbing/Filtering Media for Bioslope/Bioswale Design
(04/2015)
Status: Completed
-
Weigh-In-Motion (WIM) Sensor and Controller Operation and Performance Comparison
(04/2015)
Status: Completed
-
Investigate the Effectiveness of Using Bluetooth Low Energy (BLE) Technology to Trigger In-Vehicle Messages at Work Zones
(04/2015)
Status: Completed
-
University of Minnesota Snow Control Web Tools: Maintenance and Administration
(03/2015)
Status: Completed
-
Regional Accessibility Website
(03/2015)
Status: Completed
-
Advanced Flexibility in Design and Complete Streets, FY15
(03/2015)
Status: Completed
-
Building Expertise for Connected Vehicle Safety Applications
(02/2015)
Status: Completed
-
American Association of State and Highway Transportation Officials, Subcommittee on Bridges and Structures, Meeting
(02/2015)
Status: Completed
-
App: Travel and Activity Recapper
(01/2015)
Status: Completed
-
Spatial and Skills Mismatch of Unemployment and Job Vacancies: Opportunities for Integrated Transit and Workforce Development
(01/2015)
Status: Completed
-
Innovative Technology Workshop on 3D Lidar
(01/2015)
Status: Completed
-
Integration of Advanced Timber Bridge Inspection Techniques
(01/2015)
Status: Completed
-
New CEO Orientation and Peer Exchange
(01/2015)
Status: Completed