1997
Active and Completed Research Projects
-
MALL 2: Mobility and Accessibility in Later Life, Phase II
(12/1997) Status: Completed
-
SAFETRUCK: Preventive Run-off-the-Road Accidents and Collisions
(12/1997) Status: Completed
-
Transverse Stiffener Beams in Longitudinally Nail Laminated Timber Decks
(11/1997) Status: Completed
-
Determining the Value of Real Time Congestion Information for Commercial Vehicle Operators
(11/1997) Status: Completed
-
Incorporation of Reliability in Minnesota Mechanistic-Empirical Pavement Design
(10/1997) Status: Completed
-
Equilibrium Moisture Content of Wood in Minnesota Timber Bridges
(10/1997) Status: Completed
-
Computation of ESALs for the Mn/ROAD Mainline Cells
(09/1997) Status: Completed
-
Mn/ROAD Data Analysis and Review of Low-Volume Road Pavement Design
(09/1997) Status: Completed
-
Calibration of Earth Pressure Cells
(09/1997) Status: Completed
-
Using Transportation to Recycle, Revitalize, and Reconfigure the Post Industrial City
(09/1997) Status: Completed
-
Telecommunications Networks, Information Technology and Transportation Research Initiative
(09/1997) Status: Completed
-
Evaluation of Electrochemical Chloride Extraction
(08/1997) Status: Completed
-
Next Generation R/WIS: Video Clip Based Integrated Visual R/WIS
(08/1997) Status: Completed
-
Improving the Nodulation and Nitrogen (N2) Fixation of Prairie Legumes Used in Roadside Revegetation in Minnesota
(08/1997) Status: Completed
-
Trade Centers of Minnesota - A 1997 Update
(08/1997) Status: Completed
-
Bicycle Counter
(08/1997) Status: Completed
-
System Simulation and Optimization
(07/1997) Status: Completed
-
Investigating Differences In Driver Accident Involvement
(07/1997) Status: Completed
-
Twin Cities Regional Dynamics - Phase 3
(07/1997) Status: Completed
-
Interpreting Traces from a Lossy TDR System and Optimizing System Performance
(07/1997) Status: Completed
-
Integrated Simulation and Information System for Traffic Management, Operations and Control
(07/1997) Status: Completed
-
Investigation of Recycled Asphalt Pavement (RAP) Mixtures
(07/1997) Status: Completed
-
Superpave Level I Mix Design at the Local Government Level
(07/1997) Status: Completed
-
Twin Cities Regional Dynamics:Phase 2
(07/1997) Status: Completed
-
The Effectiveness of a Motivational-based Fatigue-Countermeasure in Reversing Fatigue-related Decrements in Driving
(07/1997) Status: Completed
-
North I-35W Corridor Study
(07/1997) Status: Completed
-
Dynamic Structural Analysis of Light Weight Guideways Used for Personal Rapid Transit Systems
(06/1997) Status: Completed
-
Acoustic Emission Monitoring of Fatigue Cracks in Steel Bridge Girders
(06/1997) Status: Completed
-
Twin Cities Regional Dynamics
(06/1997) Status: Completed
-
Measurement of Moisture in Aggregate Stock Piles
(04/1997) Status: Completed
-
Sample-Based Estimation of Bicycle-Miles of Travel
(04/1997) Status: Completed
-
Effect of Seeding Date on Establishment of Native Grasses
(03/1997) Status: Completed
-
Human Factors Evaluation of Etak/Delco's In-Vehicle Navigation System
(03/1997) Status: Completed
-
Mycorrhizal/Plant Factors Involved in Roadside Reclamation
(03/1997) Status: Completed
-
Futures Research Environmental Scanning Implementation
(03/1997) Status: Completed
-
Investigation of Driver Fatigue
(03/1997) Status: Completed
-
Bayesian Methods for Estimating Average Vehicle Classification Volumes
(03/1997) Status: Completed
-
Development Length of GFRP Reinforcement in Concrete Bridge Decks
(02/1997) Status: Completed
-
Pedestrian Control at Intersections: Phase III
(02/1997) Status: Completed
-
Live Load Stresses in Steel Curved Girder Bridges
(02/1997) Status: Completed
-
Maintaining the Traffic Control System - Phase II
(02/1997) Status: Completed
-
Simulation Validation
(02/1997) Status: Completed
-
Evaluation of Radar for Snowplows
(02/1997) Status: Completed
-
Truck Size and Weight
(01/1997) Status: Completed
-
Minnesota Community Bicycle Safety Project
(01/1997) Status: Completed