-
Advanced LED Warning Signs for Rural Intersections Powered by Renewable Energy (ALERT System): Phase II
(12/2011)
Status: Completed
-
Robotic Roadway Message and Symbol Painter Implementation
(12/2011)
Status: Completed
-
Metropolitan Travel Survey Archive; Phase 4
(12/2011)
Status: Completed
-
Communications and Outreach Support for the Minnesota Council on Transportation Access, FY12
(12/2011)
Status: Completed
-
Impacts of Minnesota's Primary Seat Belt Law
(12/2011)
Status: Completed
-
Bike-Share Station Local Economic Activity Study
(12/2011)
Status: Completed
-
MnDOT Context Sensitive Solutions and Advanced Flexibility in Design Workshops, Webinars and Forum - Fiscal Year 2012
(11/2011)
Status: Completed
-
Implementation of Pavement Evaluation Tools
(11/2011)
Status: Completed
-
Identifying Issues Related to Deployment of Automated Speed Enforcement - FY12 TechPlan
(11/2011)
Status: Completed
-
Administrative Support for the Minnesota Freight Advisory Committee - Fiscal Year 2012
(11/2011)
Status: Completed
-
Instrumentation of Navistar Truck for Data Collection
(11/2011)
Status: Completed
-
Testing and Development of Smartphone Applications for Bicycle Route Tracking - FY12 TechPlan
(11/2011)
Status: Completed
-
Use of Non-Woven Fabric Interlayer for Unbonded Concrete Overlays
(11/2011)
Status: Completed
-
Matrix (Partially Grouted) Riprap Lab Flume Study
(11/2011)
Status: Completed
-
Performance Based Measurement of Optimum Moisture for Soil Compaction
(10/2011)
Status: Completed
-
Toward Zero Deaths Administration and Outreach- 2011-2012
(10/2011)
Status: Completed
-
Transportation Engineering and Road Research Alliance Board Support- Fiscal Year 2012-2013
(10/2011)
Status: Completed
-
Toward Zero Deaths Regional Workshops- 2012-2013
(10/2011)
Status: Completed
-
Toward Zero Deaths Conference- 2011-2012
(10/2011)
Status: Completed
-
Methodologies for Counting Bicyclists and Pedestrians in Minnesota: An Integrated Approach to Measuring and Modeling Non-motorized Traffic
(10/2011)
Status: Completed
-
Planning and Implementation of Complete Streets at Multiple Scales
(10/2011)
Status: Completed
-
Teen Driver Support System (TDSS) Field Operational Test
(10/2011)
Status: Completed
-
How Do We Keep People on Rural Transit After the Construction Project Ends?
(10/2011)
Status: Completed
-
Mn/DOT RSS Report Publication Services, FY12
(10/2011)
Status: Completed
-
Guidelines for Local Concrete Infrastructure and Updating the State Aid Concrete Pavement Rehabilitation Best Practices Manual (2006)
(09/2011)
Status: Completed
-
Operational Research Program for Local Transportation Groups, 2012
(09/2011)
Status: Completed
-
Development of Active Traffic Management Strategies for Minnesota Freeway Corridors with Enhanced Variable Speed Limit Control System
(09/2011)
Status: Completed
-
Improved Approach to Enforcement of Road Weight Restrictions
(09/2011)
Status: Completed
-
Video Detection and Classification of Pedestrian Events at Roundabouts and Crosswalks
(09/2011)
Status: Completed
-
Investigation of Shear Distribution Factors in Prestressed Concrete Girder Bridges
(09/2011)
Status: Completed
-
Local Technical Assistance Program (LTAP), 2012
(09/2011)
Status: Completed
-
Mitigating Run-Off-Road Crashes: Multimodal Interventions
(09/2011)
Status: Completed
-
Annual Accessibility Measure for the Twin Cities Metropolitan Region
(09/2011)
Status: Completed
-
Hand Images in Virtual Spatial Collaboration for Traffic Incident and Disaster Management
(08/2011)
Status: Completed
-
Research on How to Achieve System-Level, Transit-Oriented Jobs-Housing Balance
(07/2011)
Status: Completed
-
Improving Freeway Traffic Speed Estimation Using High Resolution Loop Detector Data
(07/2011)
Status: Completed
-
Evaluating Twin Cities Transitways' Performance and their Interaction with Traffic on Neighboring Major Roads
(07/2011)
Status: Completed
-
Limited Deployment of Friction Measurement and Applicator Control Systems for Winter Road Maintenance
(07/2011)
Status: Completed
-
Continued Field Testing and Refinement of Novel Water and Ice Sensor Systems on Bridge Decks - FY12 NATSRL
(07/2011)
Status: Completed
-
Bus Driver Intersection Task Analysis: Investigation of Bus-Pedestrian Crashes
(07/2011)
Status: Completed
-
Thermal Imaging-based Driver Alert System with Real-time Mapping of Roadside Deer Locations - FY12 NATSRL
(07/2011)
Status: Completed
-
Field Study of Driver Behavior at Flashing Yellow Arrow vs Green Ball Permitted Left-Turn Indications
(07/2011)
Status: Completed
-
Spatial Cognition of the Blind and Visually Impaired While Using a Mobile Accessible Pedestrian System (MAPS) at Signalized Intersections
(07/2011)
Status: Completed
-
Snowplow Warning System for Drivers using V2V and/or V2I based DSRC Communication and Variable Message Signs (VMSs) - FY12 NATSRL
(07/2011)
Status: Completed
-
Improve the Safety and Efficiency of Roadway Maintenance Phase II: Developing a Vision Guidance System for the Robotic Roadway Message Painter - FY12 NATSRL
(07/2011)
Status: Completed
-
An Onboard Virtual Rumble-Strip Based Operation for Road Departure Warning Phase II - FY12 NATSRL
(07/2011)
Status: Completed
-
A Prototype System for Chemical Hydrogen Generation and Storage for Operating ITS Devices - FY12 NATSRL
(07/2011)
Status: Completed
-
Development of a Multiple-Camera Tracking System for Accurate Traffic Performance Measurements at Roundabouts/Intersections - FY12 NATSRL
(07/2011)
Status: Completed
-
MPO Funding
(06/2011)
Status: Completed
-
Development and Evaluation of Effective Turbidity Monitoring Methods for Construction Projects
(06/2011)
Status: Completed
-
Size- and Shape-Effects on Safety Factors of Quasibrittle Structures
(06/2011)
Status: Completed
-
Mode share
(06/2011)
Status: Completed
-
Cooperative Intersection Collision Avoidance System (CICAS) -Stop Sign Assist: Field Operational Test, ABA Study, and Vehicle Infrastructure Study Conclusion
(06/2011)
Status: Completed
-
Effect of Signing and Striping on the Safety of a Two-Lane Roundabout
(06/2011)
Status: Completed
-
Evaluation of the Effect MnPASS Lane Design has on Mobility and Safety
(05/2011)
Status: Completed
-
Administrative Support for the Minnesota Freight Advisory Committee
(05/2011)
Status: Completed
-
Corridors of Opportunity Evaluation
(05/2011)
Status: Completed
-
Synthesis of Performance Testing for Asphalt Concrete
(05/2011)
Status: Completed
-
Investigating the Effectiveness of Intelligent Lane Control Signals on Driver Behavior
(05/2011)
Status: Completed
-
Intellidrive for Safety, Mobility, and User Fee Project: Driver Performance and Distraction Evaluation
(05/2011)
Status: Completed
-
A Research Plan and Factors Effecting Service Life for Culvert Pipe Materials in Minnesota
(04/2011)
Status: Completed
-
Communications and Outreach Support for the Minnesota Council on Transportation Access
(04/2011)
Status: Completed
-
Itasca County Area Transportation Study, Phase II
(04/2011)
Status: Completed
-
Automate Traffic Data Quality Verification and Sensor Calibration for Weight-In-Motion Systems
(04/2011)
Status: Completed
-
Scour Monitoring Technology Implementation
(04/2011)
Status: Completed
-
Description and Inventory of Deputy Surveyors' Contracts in Minnesota
(04/2011)
Status: Completed
-
Validation of Wetland Mitigation in Abandoned Borrow Areas
(03/2011)
Status: Completed
-
Enhanced Surveillance and Tracking Solution TWSG Task PS
(03/2011)
Status: Completed
-
2011 Environmental Stewardship and Streamlining Workshop
(03/2011)
Status: Completed
-
Mn/DOT Research Librarian Services, 2011-12
(03/2011)
Status: Completed
-
FY11 Mn/DOT Hear Every Voice Training and Assistance
(03/2011)
Status: Completed
-
Development of a Low-Temperature Cracking-Resistant Mixture
(03/2011)
Status: Completed
-
Decarbonising the "Last Mile": Leveraging Social Media and Mobile ICT to Mitigate the Carbon Footprint of Online Shopping
(03/2011)
Status: Completed
-
Advancing Transportation Research via Sensing, Control, and Visualization
(03/2011)
Status: Completed
-
Design and Performance of Asphalt Mixtures Containing High Percentage Recycled Materials
(02/2011)
Status: Completed
-
MnDOT Design Bid Build Quality Management Process Manual Training Project
(02/2011)
Status: Completed
-
Toward Zero Deaths Regional Workshops, 2011
(02/2011)
Status: Completed
-
LRRB Workshop: Shaping Research on Systems Planning for Local Roads
(02/2011)
Status: Completed
-
Engagement Strategies for Enhancing Public Participation in Technically Complex Transportation Financing and Service Planning
(02/2011)
Status: Completed
-
Assessment of the Health of Structural Systems via Laser-Enabled Agile Sensing
(02/2011)
Status: Completed
-
Rethinking How We Manage Traffic to Reduce Emissions While Maintaining Mobility: A New Paradigm for Traffic Management
(02/2011)
Status: Completed
-
Innovative Technologies for Lifetime Extension of an Aging Inventory of Vulnerable Bridges
(02/2011)
Status: Completed
-
How Will the Four-Day School Week Influence Vacationing, Tourism and Recreational Spending in Minnesota?
(02/2011)
Status: Completed
-
A Fast, Action-Based Algorithm for Paratransit Vehicle Assignment
(02/2011)
Status: Completed
-
Benefits of Distance-Based Fees for the Trucking Industry
(02/2011)
Status: Completed
-
Improving Traffic Signal Operations for Integrated Corridor Management (ICM)
(02/2011)
Status: Completed
-
Development of Techniques to Quantify Effective Impervious Cover
(02/2011)
Status: Completed
-
ITS and Transportation Safety: EMS System Data Integration to Improve Traffic Crash Emergency Response and Treatment - Phase IV - FY11 TechPlan
(01/2011)
Status: Completed
-
ITS and Transportation Safety: EMS System Data Integration to Improve Traffic Crash Emergency Response and Treatment - Phase V - FY12 TechPlan
(01/2011)
Status: Completed
-
Consumer Travel Behavior and Retail Geography: A Microscopic Investigation Using GPS Data and Parcel-Level Land Use - FY11 TechPlan
(01/2011)
Status: Completed
-
FY11 Mn/DOT Cost Estimation and Cost Management Training (CE/CM)
(01/2011)
Status: Completed
-
Twin Cities Urban Sustainability Forum
(01/2011)
Status: Completed
-
50-year Vision for Transportation in Minnesota
(01/2011)
Status: Completed
-
Scenic Byways: Economic impact and quality of life
(01/2011)
Status: Completed
-
ITS Data Needs: How Much Do We Really Need to Know? - FY11 TechPlan
(01/2011)
Status: Completed
-
Computing Auto Accessibility to Other Destinations
(01/2011)
Status: Completed
-
Smartphone-Based Travel Experience Sampling and Behavior Intervention among Young Adults (UbiActive Phase I) - FY11 TechPlan
(01/2011)
Status: Completed