2022
Active and Completed Research Projects
-
Haul Road and Detour Maintenance
(12/2022) Status: Completed
-
Western Minnesota Contactless Payment Project
(12/2022) Status: Completed
-
Development and demonstration of a novel Red Light Running Warning System using connected v2i technology
(12/2022) Status: Completed
-
Development of a System to Report School Bus Stop-Arm Violations
(11/2022) Status: Completed
-
Performance Evaluation of Reinforced Concrete Box Culverts
(10/2022) Status: Active
-
Development of Erosion Control Product Longevity Test Methodology
(10/2022) Status: Active
-
Re-use of Minnesota waste material in sustainably design soils. Part 2.
(10/2022) Status: Completed
-
Local Technical Assistance Program Base Operations, Fiscal Year 2023-2024
(10/2022) Status: Completed
-
Office of Project Management and Technical Support Workshop: Roundabout Design Software and MnDOT Design Guidelines, Fiscal Year 2023
(10/2022) Status: Completed
-
Capturing Contaminants of Emerging Concern (CECs) with Biofiltration
(09/2022) Status: Completed
-
An Experimental and Feasibility Study of Tele-operated Autonomous Vehicles
(09/2022) Status: Completed
-
Increasing Food Access: Integrated Vehicle Routing and Assortment Planning for Mobile Markets
(09/2022) Status: Completed
-
Understanding risks and opportunities for ramp metering control in a mixed-autonomy future
(09/2022) Status: Completed
-
MnDOT's Mobility-as-a-Service Platform: Assessing User Behavior and Measuring System's Benefits
(09/2022) Status: Completed
-
Compost in Stormwater Bioretention Systems
(09/2022) Status: Completed
-
FY23-24 Local Technical Assistance Program (LTAP) Expanded Activities
(09/2022) Status: Completed
-
Global Climate Geodesign Challenge
(09/2022) Status: Completed
-
The Grand Iron Range CAV Initiative Data and Research Support
(08/2022) Status: Completed
-
Towards implementation of max-pressure control on Minnesota roads: Phase 2
(08/2022) Status: Completed
-
Assessment of Travel-Time Reliability and Operational Resilience of Metro Freeway Corridors
(08/2022) Status: Completed
-
MMUCC MNCrash Updates
(08/2022) Status: Completed
-
FY23 MnDOT Design Institute and Preliminary Design Geometric Layout Workshops
(08/2022) Status: Completed
-
Regional Optimization of Roadside Turfgrass Seed Mixtures Phase 3: Assessing Long-Term Performance and Creating a Web-Based Decision Tool
(08/2022) Status: Active
-
Cybersecurity for mixed-autonomy traffic: detection and localization of compromised vehicles
(07/2022) Status: Completed
-
Evaluating Treatment and Options for Wastewater Treatment at Rest Areas and Truck Stations
(07/2022) Status: Completed
-
Thinking inside the box (culvert): Developing a low-cost, easy-to-install retrofit prototype for fish passage
(07/2022) Status: Completed
-
Identification and Assessment of Preventative Methods to Mitigate Cognitive and Physical Declines Which Influence Driving Performance of Older Drivers
(07/2022) Status: Active
-
Transportation Policy and Economic Competitiveness FY23
(07/2022) Status: Completed
-
Positioning and Localization Sensor Data Sets for Aerial Autonomy Research
(07/2022) Status: Active
-
Updating the 2009 Stormwater BMP Maintenance Resource Guide
(07/2022) Status: Completed
-
U of M Snow Control Web Tools: Maintenance & Administration, FY22-23
(07/2022) Status: Completed
-
Towards Edge-assisted Intelligent Driving: Cooperative Learning for Low-Latency V2I Communications & AV Remote Control
(07/2022) Status: Completed
-
The values of dedicated right of way to transit ridership and carbon emissions
(06/2022) Status: Completed
-
Mitigation of tenting of transverse cracks and joints in asphalt pavement
(06/2022) Status: Completed
-
Addressing the research needs for the sustainable application of TDA in stormwater infiltration/treatment.
(06/2022) Status: Completed
-
NSTI 2022 CAV Career Pathways Camp
(06/2022) Status: Completed
-
Inland Waterways System, Stressors, Commodity Flows, Data Analytics, Decision Support Tools
(06/2022) Status: Completed
-
Feasibility Study: State - Tribal Partnership to Support Solar Energy
(04/2022) Status: Completed
-
Access in Appalachia Pilot Implementation
(04/2022) Status: Completed
-
Reducing emission of methane through advanced radical kinetics and adaptive burning in large engines (REMARKABLE)
(03/2022) Status: Completed
-
Transportation Equity Training for MnDOT
(03/2022) Status: Completed
-
Connected and Automated Vehicle Engagement Activities: Drive MN and CAV Conference and Technology Showcase
(03/2022) Status: Completed
-
Plasma-Assisted Pre-Chamber Ignition System for Highly Dilute Stoichiometric Heavy-Duty Natural Gas Engines
(03/2022) Status: Completed
-
Funding shared mobility services as an extension of existing public transit services
(02/2022) Status: Completed
-
Assessment of Pedestrian Safety and Driver Behavior Near an Automated Vehicle
(02/2022) Status: Completed
-
Exploring Shared Mobility Public-Private Partnerships
(02/2022) Status: Completed
-
National Accessibility Evaluation 2021 Metropolitan Council
(01/2022) Status: Completed