2005
Active and Completed Research Projects
-
Design Tool for Controlling Runoff and Sediment from Highway Construction
(12/2005) Status: Completed
-
Access Study Administration and Outreach
(12/2005) Status: Completed
-
State DOT CEO Leadership Forum---Summer 2006
(12/2005) Status: Completed
-
Enhanced Micro-Simulation Models for Accurate Safety Assessment
(12/2005) Status: Completed
-
Truck Weight Compliance Education and Outreach Program
(12/2005) Status: Completed
-
Local Road Funding History
(11/2005) Status: Completed
-
Best Use of Cone Penetration Testing
(11/2005) Status: Completed
-
Employment of the Traffic Management Laboratory for improving the Stratified Metering Algorithm: Phase III
(11/2005) Status: Completed
-
Evaluating the Effectiveness of the Minnesota Speed Management Program
(10/2005) Status: Completed
-
Evaluation of Minnesota's Operation NightCAP
(10/2005) Status: Completed
-
2006 Environmental Stewardship and Streamlining Workshop
(10/2005) Status: Completed
-
Portable Traffic Video Processor
(09/2005) Status: Completed
-
Instrumentation of a Full Depth Precast Concrete Bridge Deck System
(09/2005) Status: Completed
-
SAFETEA-LU Technical Workshop
(09/2005) Status: Completed
-
Development of Eight-Channel WIM Analysis and Measurement System Based on Analog WIM Signals
(09/2005) Status: Completed
-
Access to Destinations: Estimation of Arterial Travel Times
(09/2005) Status: Completed
-
Development of Improved Proof Rolling Methods for Roadway Embankment Construction
(09/2005) Status: Completed
-
Commuter Bicyclist Behavior and Facility Disruption
(08/2005) Status: Completed
-
Monitoring and Analysis of a Full Depth Precast Concrete Bridge Deck
(08/2005) Status: Completed
-
Improving Capacity Planning for Demand-Responsive Paratransit Services
(08/2005) Status: Completed
-
2005 Toward Zero Deaths Conference
(08/2005) Status: Completed
-
Evaluation and Analysis of Mn/DOT Steel Bridge Inventory for Prioritizing Bridge Maintenance Needs
(08/2005) Status: Completed
-
Evaluating Roadway Subsurface Drainage Practices
(08/2005) Status: Completed
-
2005 Toward Zero Deaths Administration and Outreach
(08/2005) Status: Completed
-
A Predictive Study of Use Impacts on the Denali Park Road
(08/2005) Status: Completed
-
Project Delivery Workforce Management Review
(07/2005) Status: Completed
-
Privacy Issues of ITS
(07/2005) Status: Completed
-
Multi-Camera Monitoring of Human Activities at Critical Transportation Infrastructure Sites
(07/2005) Status: Completed
-
Integration of Automated Vehicle System Data Acquisition into Fleet Management - FY06 NATSRL
(07/2005) Status: Completed
-
Truckers & Turnover Project
(07/2005) Status: Completed
-
Assessment of Stormwater Management Practices on the Water Quality of Runoff
(07/2005) Status: Completed
-
Integrated TDRL Projects: DLL Traffic Software Devlpmnt Pckg, Gravel-Road Traffic Counter, Intersection Traffic Movement Counter, Hybrid-Renewable Light Pole -FY06 NATSRL
(07/2005) Status: Completed
-
NCHRP 10-69 Guidelines for Dowel Alignment in Concrete Pavements
(07/2005) Status: Completed
-
Impacts of Bus Rapid Transit on West Broadway Neighborhoods in North Minneapolis
(07/2005) Status: Completed
-
Rural and Urban Safety Cultures
(07/2005) Status: Completed
-
The Minnesota River State Trail: Redwood Falls, New Ulm, & Saint Peter
(07/2005) Status: Completed
-
GPR Implementation
(06/2005) Status: Completed
-
Access to Destinations: Refining Methods for Calculating Non-Auto Travel Times
(06/2005) Status: Completed
-
Assessment of Underground Stormwater Management Devices on the Water Quality of Runoff
(06/2005) Status: Completed
-
Pavement Rehabilitation Selection
(06/2005) Status: Completed
-
Metropolitan Travel Survey Archive
(06/2005) Status: Completed
-
Train the Trainer Workshop for blowing snow control
(06/2005) Status: Completed
-
MnROAD Lessons Learned
(06/2005) Status: Completed
-
Development of Real-Time Traffic Adaptive Crash Reduction Measures for the Westbound I-94/35W Commons Section
(05/2005) Status: Completed
-
Determination of Optimum Time for the Application of Surface Treatments to Asphalt Concrete Pavements - Phase II
(05/2005) Status: Completed
-
Great Lakes Maritime Research Institute (GLMRI)
(05/2005) Status: Completed
-
Real-Time Traffic Prediction for Advanced Traffic Management Systems: Phase II
(05/2005) Status: Completed
-
2005 Midwest Regional Context Sensitive Design and Solutions Workshop
(04/2005) Status: Completed
-
Urban Development Effects on Runoff and Receiving Stream Temperatures
(03/2005) Status: Completed
-
Resilient Modulus Development of Aggregate Base and Subbase Containing Recycled Bituminous and Concrete for 2002 Design Guide and MnPAVE Pavement Design
(03/2005) Status: Completed
-
GIS Protocols: Measuring the Pedestrian Environment
(03/2005) Status: Completed
-
Integration of RTMS and SQL to Mn/DOT Next Generation R/WIS - Phase 2
(02/2005) Status: Completed
-
2005 Environmental Stewardship and Streamlining Workshop
(02/2005) Status: Completed
-
Development of a Trash Harvester for MNDot Phase 1
(01/2005) Status: Completed
-
Studying the Needs of the Transportation Disadvantaged: Elderly and Developmentally Disabled
(01/2005) Status: Completed