1994
Active and Completed Research Projects
-
Human Factors Research Program, Phase 1
(12/1994) Status: Completed
-
An Asphalt Paving Tool for Adverse Conditions
(12/1994) Status: Completed
-
Identification of Factors Affecting Freeway Accidents
(12/1994) Status: Completed
-
Release Methodology of Prestressed Strands
(11/1994) Status: Completed
-
Cracking in Concrete Bridge Decks
(11/1994) Status: Completed
-
Real-Time Traffic Prediction for Advanced Traffic Management Systems: Phase I
(11/1994) Status: Completed
-
Development of traffic simulation laboratory design, planning and traffic operations
(11/1994) Status: Completed
-
Development of a parallel simulation algorithm for freeway traffic flows on distributed personal computer system,Phase 1
(11/1994) Status: Completed
-
Reintroduction of Soil Mycorrhizae into Roadside Prairie Planting
(10/1994) Status: Completed
-
Repair of Metal Culverts, Phase 1
(10/1994) Status: Completed
-
Reassessment of Diametral Compression Test on Asphalt Concrete
(09/1994) Status: Completed
-
Pedestrian Control at Intersections - Phase I
(09/1994) Status: Completed
-
Development of an Accelerated Loading Test Platform for Pavements
(09/1994) Status: Completed
-
Dynamics and Stability of Capsules in Pipeline Transportation
(09/1994) Status: Completed
-
New Retroreflective Sheeting Materials on Highway Signs
(09/1994) Status: Completed
-
Investigation of Asphalt Mixtures at Mn/ROAD
(09/1994) Status: Completed
-
A SemiTractor-Trailer Testbed for the Investigation of Guidance
(09/1994) Status: Completed
-
Congestion Pricing for the Twin Cities Metropolitan Area
(09/1994) Status: Completed
-
Shifting Global Airline Service and the Local Community
(09/1994) Status: Completed
-
Stresses in Steel Curved Girder Bridges
(08/1994) Status: Completed
-
Real-Time Mass Concentration Spectrometer
(08/1994) Status: Completed
-
Establishment of Native Sedge Vegetation in Created Wetlands
(07/1994) Status: Completed
-
Strategic Management Research and Implementation
(07/1994) Status: Completed
-
Evaluation of LIDAR System for Area Sensing of Vehicle Emissions- Phase 2
(07/1994) Status: Completed
-
Use of Non-Metallic Reinforcement in Concrete Structures
(07/1994) Status: Completed
-
Enhancements of the KRONOS Simulation Package and Database, Phase 3
(06/1994) Status: Completed
-
Development and Application of On-Line Strategies for Optimal Intersection Control, Phase 3
(03/1994) Status: Completed